Q1. How many types of attributes are considered in TOPSIS? 

  • 2
  • 4
  • 5
Answer:- 3

Q2. Two artificial alternative solutions are considered in

  • AHP
  • TOPSIS
  • ANP
  • DEMATEL
Answer:- TOPSIS

Q3. TOPSIS method selects the alternative that is 

  • Closest to the ideal solution 
  • Farthest from the negative ideal solutions
  • Both (a) and (b)
  • None of the above
Answer:- Both (a) and (b)

Q4. Which is not the quantitative method of demand forecasting?

  • Jury of executive method
  • Moving average method 
  • Time projection method
  • Exponential smoothing method
Answer:- Jury of executive method

Q5. Which is the causal method of demand forecasting?

  • Delphi technique
  • Jury of executive method
  • Exponential smoothing method 
  • Econometric analysis
Answer:- Econometric analysis

Q6. Econometric forecasts require

  • accurate estimates of the coefficients of structural equations.
  • forecasts of future values of exogenous variables.
  • appropriate theoretical models.
  • all of the above.
Answer:- all of the above.

Q7. Which of the following is not a qualitative forecasting technique?

  • Surveys of consumer expenditure plans 
  • Time-series analysis
  • Perspectives of foreign advisory councils
  • Consumer intention polling
Answer:- Time-series analysis

Q8. Which is not a type of forecasting method?

  • Qualitative method
  • Quantitative method
  • MCDM method
  • Causal method
Answer:- MCDM method

Q9.Equal weightages to all the data points are given in 

  • Moving average method
  • Exponential smoothing method
  • Both (a) and (b)
  • None of the above
Answer:- Moving average method

Q10. In which method the weightage given to the older data points decreases?

  • Moving average method
  • Exponential smoothing method
  • Both (a) and (b)
  • None of the above
Answer:- Exponential smoothing method