Q1. Which of the following is a cost estimating technique? 

  • Variance management
  • Cost aggregation 
  • Parametric estimating 
  • Cost change control system 
Answer:- Parametric estimating

Q2. A cost performance index value greater than 1.0 signifies:

  • Cost underrun  
  • Cost overrun 
  • Cost run equal
  • None of the above
Answer:- Cost underrun 

Q3. Schedule value is termed as: 

  • Earned value – Actual value 
  • Earned value – Planned value
  • Actual cost – planned value 
  • Actual cost – Earned value 
Answer:- Earned value – Planned value

Q4. Cost performance index is calculated by using:

  • Actual cost / Planned value  
  • Planned value / Earned value
  • Budget cost at completion / Actual cost 
  • Earned value / Actual cost 
Answer:- Earned value / Actual cost 

Q5. Which of the following is not used to provide performance measurement of any work at a given point of time. 

  • Planned value 
  • Budgeted cost at completion 
  • Earned value 
  • Actual cost
Answer:- Budgeted cost at completion

Q6. Which of the following is not a cost budgeting input? 

  • Project scope statement
  • WBS Dictionary  
  • Resource calendar 
  • Performance reports 
Answer:- Performance reports 

Q7. Which of the following is not a cost control technique? 

  • Reserve analysis  
  • Project performance reviews
  • Forecasting 
  • Variance management 
Answer:- Reserve analysis 

Q8. Cost value can be regarded as: 

  • Earned value – Actual cost  
  • Earned value – Planned value 
  • Planned value – Actual cost
  • Planned value – Earned value 
Answer:- Earned value – Actual cost 

Q9. Estimating the cost of individual work packages or individual schedule activities with the lowest level of detail is called? 

  • Parametric Estimating 
  • Bottom-up Estimating 
  • Vendor Bid Analysis 
  • Reserve Analysis 
Answer:- Bottom-up Estimating 

Q10. Which one of the following is not a dimension of Quality? 

  • Performance 
  • Reliability 
  • Cost
  • Durability 
Answer:- Cost